Facing tight budgets but need more power efficiency? Dive in and share your strategies for optimizing your system's performance.
-
It is essential to conduct a detailed analysis of the current system to identify areas of waste and opportunities for improvement. Investing in automation and monitoring technologies may seem costly initially, but in the long run, these tools help reduce losses and improve operational efficiency. Regular preventive maintenance is another crucial practice, as it prevents unexpected failures and extends the lifespan of equipment.
-
First: I start by analyzing the current system to identify weaknesses and waste by using analysis tools to analyze performance data and discover areas for improvement. I evaluate the design of the power distribution system and discover opportunities for improvement. I introduce renewable energy sources such as solar or wind. Second: I should rely on preventive maintenance instead of reactive maintenance and replace the entire system. This allows me to update components gradually by choosing improvements that provide the greatest efficiency.
-
Quando há restrição orçamentária é comum focar em realizar a manutenção preventiva do sistema elétrico e seus componentes de maneira correta. Para isso é necessário realizar uma análise prévia, revisar as cargas de maior consumo, aterramento e harmônicas nas linhas dos equipamentos sensÃveis, podem ocorrer perdas de energia que representam maior consumo, além de verificação das conexões e melhor controle do fator de potência para evitar multas. Em seguida, as modificações que estão ao seu alcance são executadas com o plano de manutenção, começando sempre pelas prioritárias.
-
When facing budget constraints in a power distribution system, I rely on my experience in managing electrical projects to maximize efficiency. I focus on optimizing resource allocation, ensuring that critical areas receive necessary resources while cutting costs in less critical ones. In previous roles, I implemented strategic procurement processes that resulted in up to 10% savings. Additionally, I refine protection schemes and commissioning processes, as I did in high-voltage substations, improving efficiency by 20%. I also analyze existing systems to identify opportunities for automation and preventive maintenance, reducing downtime and operational costs while staying within budget.
Rate this article
More relevant reading
-
Plant EngineeringWhat are the best ways to reduce settling time in a control loop?
-
Power SystemsWhat are the best methods to measure and improve damping performance in power systems?
-
Electrical DesignHow can you damp oscillations in a power system?
-
Power SystemsWhat are the advantages and disadvantages of using power system stabilizers (PSS) to damp out oscillations?